Tanger Automotive City · TAC
Factory construction for automotive suppliers in Tanger Automotive City
Setting up a production plant in Tanger Automotive City? INTEC BATI builds steel-frame industrial buildings for automotive suppliers, with a schedule built around your start of production.
TAC, the automotive platform of Tanger Med Zones
Tanger Automotive City is a 720-hectare zone run by Tanger Med Zones for automotive suppliers, component makers and logistics providers. It is part of the industrial ecosystem that has made the Tangier region one of Morocco's main automotive hubs.
Our structural steel plant is in Tangier, in the Mghogha industrial zone, so we work right next to the region's projects.
What an automotive supplier needs from its building
A start-of-production date that holds
The building drives the production launch: we plan backwards from that date.
Well-organised flows
Loading docks, sectional doors and circulation designed with your logistics team.
Large open floor areas
Steel portal frames keep the floor clear for installing and re-arranging lines.
Extensions planned ahead
The structure can be designed to be extended when volumes ramp up.
Integrated offices
Offices and interior fit-out delivered in the same project.
An insulated envelope
Insulated roofing and cladding, skylights for natural light in the workshops.
Proven experience with automotive suppliers
For more than 18 years we have been building for the automotive industry in Morocco. Our references include Aptiv, Valeo, Kromberg & Schubert, Hirschmann Automotive, Prettl, Souriau, Mitsui Kinzoku ACT, Sealynx Automotive, Eurostyle Systems, Motherson and Sentury Tire.
These projects show schedules suited to the sector: 15,000 m² for Aptiv in 6 months, 10,000 m² for Mitsui Kinzoku ACT in 6 months, 28,000 m² for Kromberg & Schubert in 10 months.
How we run your project
After a first meeting on your plot, our engineering office prepares a preliminary design and a 3D model. Once the drawings are approved, the steel is fabricated in our plant while civil works progress. Erection starts as soon as the foundations are ready, with a single project manager keeping you informed. See our industrial construction services in Tangier.
Some of our projects in Morocco






Areas, durations and years taken from our references. More than 40 projects completed.
Frequently asked questions
Have you built for automotive suppliers before?
Yes, they make up a large share of our references: Aptiv, Valeo, Kromberg & Schubert, Hirschmann, Prettl, Mitsui Kinzoku ACT, Sealynx, Eurostyle, Motherson and Sentury Tire, among others.
Can you meet a start-of-production date?
The schedule is built from that date. Fabricating the steel in parallel with the foundations shortens the construction period.
Can a future extension be planned at the design stage?
Yes. The structure is designed to be extended, which makes a later ramp-up easier.
Let's talk about your project
Tell us about your activity, the area you need and your target date: our engineering office will come back to you with a first approach.